[journal]
양종원
/ 2002
/
Design and Implementation of Large Capacity Cable Checking System using an I/O Buffer Method
/ 한국군사과학기술학회지
/ 한국군사과학기술학회
5
(2)
: 103~115
[thesis]
Seoung-Hwa Yang
/ 2012
/ Study on Productivity Based maintenance Development Process Model considering the Development Security and Quality
/ Kon-kuk University
[other]
IPC
/ IPC-WHMA-A-620B-S, datasheet
[journal]
박용규
/ 2015
/
Load Current and Temperature Measurement for Measuring the Insulation Resistance of the 6.6 kV Cable
/ 전기전자재료학회논문지
/ 한국전기전자재료학회
28
(1)
: 46~50
/ http://dx.doi.org/10.4313/JKEM.2015.28.1.46
[report]
Yoon Deok-Ran
/ A Study on the Field Application of Live-Line Diagnostic Technique for High Voltage Cable
/ Korea Electrical Safety Corporation
[journal]
W. K. Kim
/ 2012
/ Design and Implementation of the multi-function switching system for Automatic Test Equipment(ATE)
/ Journal of the Graduate School of Industry Kumoh National Institute of Technology
[journal]
이석민
/ 2018
/
A study on Automatic field Test Equipment with improved maintenance and environmental reliability
/ 한국컴퓨터정보학회논문지
/ 한국컴퓨터정보학회
23
(3)
: 9~16
[journal]
김동준
/ 2016
/
Real-Time System Parallel Testing Techniques for Weapon System Error Verification
/ 전자공학회논문지
/ 대한전자공학회
53
(11)
: 130~138
[web]
FTDI
/ 0000
/ D2XX_Programmer's_Guide(FT_000071), User guide
/ http://www.ftdichip.com/Support/Documents/ProgramGuides/D2XX_Programmer's_Guide(FT_000071).pdf
[thesis]
Ju-Wan Ryu
/ 2007
/ Design Of Ethernet Protocol Gateway for Parallel Interface
/ Master
/ The Graduate School of Kyungpook National University
[web]
Panasonic
/ 0000
/ PA1a-12v, datasheet
/ https://www.panasonic-electric-orks.com/cps/rde/xbcr/pew_eu_en/ds_61C10_en_pa.pdf
[journal]
유성열
/ 2006
/
A Study on Job Sequence and Feeder Allocation Problem in PCB Assembly Line
/ 산업경영시스템학회지
/ 한국산업경영시스템학회
29
(1)
: 63~71
[web]
/ 0000
/
/ AN_124_User_Guide_For_FT_PROG_datasheet.pdf
[journal]
권혁진
/ 2017
/
Implementation of PXIe platform based portable Automatic Test Equipment to improve reliability
/ 한국컴퓨터정보학회논문지
/ 한국컴퓨터정보학회
22
(7)
: 9~16
[journal]
최경진
/ 2016
/
The Study on The Production Testing Equipment for the Improvement of System Test Reliability in FCS
/ 전자공학회논문지
/ 대한전자공학회
53
(11)
: 139~147
[journal]
윤영호
/ 2010
/
The Study on Improvement of ATE Reliability in Production Phase
/ 전자공학회논문지 - SC
/ 대한전자공학회
47
(6)
: 19~26
[journal]
이연호
/ 2014
/
Optimal Reliability Strategy for System Considering Redundancy and Maintenance
/ 대한산업공학회지
/ 대한산업공학회
40
(1)
: 118~127
/ http://dx.doi.org/10.7232/JKIIE.2014.40.1.118