An Overview of Time Estimation in the Appraisal of Completeness for Software

  • Journal of Software Assessment and Valuation
  • Abbr : JSAV
  • 2020, 16(1), pp.21-26
  • DOI : 10.29056/jsav.2020.06.03
  • Publisher : Korea Software Assessment and Valuation Society
  • Research Area : Engineering > Computer Science
  • Received : May 20, 2020
  • Accepted : June 19, 2020
  • Published : June 30, 2020

Yukyong Kim 1

1숙명여자대학교

Candidate

ABSTRACT

The completeness appraisal of software is performed in various forms, such as assessing the completion level in the development process, calculating the defect rate, estimating the development cost, and calculating the redevelopment cost. Along with this, the problem that is often dealt with is estimation of the development time. Even in a dispute over completeness due to delays in software development, issues of calculating an appropriate development time required to develop a delivery software or a development time required for change requests are often included in the appraisal request. In this paper, we introduce the procedure and method for estimating the appropriate project time of software development so that the appraiser can be applied to the appraisal work for determining the completeness. The method is based on the manual for calculating the appropriate project period of software development project.

Citation status

* References for papers published after 2023 are currently being built.