본문 바로가기
  • Home

The Effects of Exercise Intensity and Initial Timing on Functional Recovery after Sciatic Nerve Crush Injury in Rats

  • Journal of the Korean Society of Physical Medicine
  • Abbr : J Korean Soc Phys Med
  • 2015, 10(3), pp.219-225
  • Publisher : The Korean Society of Physical Medicine
  • Research Area : Medicine and Pharmacy > Physical Therapy > Other physical therapy

Junyan Cai 1 나상수 2 KAK HWANGBO 2

1Affiliated Hospital of Nantong University
2대구대학교

Accredited

ABSTRACT

PURPOSE: The aim of this study was to investigate the effects of exercise intensity and initial timing on functional recovery following sciatic nerve injury in rats. METHODS: Total of 80 Sprague-Dawley rats was used and randomly divided 6 groups. Under deep anesthesia, the sciatic nerve was nipped by adapted hemostatic tweezers for 30 seconds and the injured nerve was transparent under naked eyes. Acute exercise groups was applied treadmill after sciatic nerve crush injury during 5days with three type intensity. Late exercise groups was also applied treadmill during 5 days with three type intensity after 5 days break. Values of sciatic functional index were measured and analyzed in each group after exercise period. RESULTS: The sciatic functional index values between control groups 1, acute low-intensity group, acute middleintensity group in acute phase showed statistical significant (p<.05). The sciatic functional index values between control groups 2, late low-intensity group, late middle-intensity group and late high-intensity in late phase showed statistical significant (p<.05). The comparison in acute and late phase, sciatic functional index values of each low-intensity group and each high-intensity group showed statistical significant (p<.05). CONCLUSION: Whether at acute or late phase, treadmill exercise as a therapy obtained beneficial effects of functional recovery and exercise training at low speed is more beneficial effects on the recovery of motor function in acute phase.

Citation status

* References for papers published after 2023 are currently being built.