@article{ART001036723},
author={Jong-hei Ra and Kwangdon Choi and Sang-Joon Lee},
title={A Study on establishment of performance indicator using BSC for local public enterprise},
journal={Journal of The Korea Society of Computer and Information},
issn={1598-849X},
year={2006},
volume={11},
number={6},
pages={237-248}
TY - JOUR
AU - Jong-hei Ra
AU - Kwangdon Choi
AU - Sang-Joon Lee
TI - A Study on establishment of performance indicator using BSC for local public enterprise
JO - Journal of The Korea Society of Computer and Information
PY - 2006
VL - 11
IS - 6
PB - The Korean Society Of Computer And Information
SP - 237
EP - 248
SN - 1598-849X
AB - Nowadays, the administration is strongly driving self-innovation including public sector to solve problems continuously pointed out as issues of public sector such as the low management achievement, the low productivity and costliness structure, the low ability coping with market changes and ineffectiveness in managing organization. The core of such renovation is the systematic performance management. Provincial public enterprises are also required to furnish system that can measure management results accurately and make payment according to measured results under autonomous management system to raise management efficiency and strengthen competitive power. In this paper, we design framework for measuring management results of provincial public enterprises based on Balanced Scorecard and show the example applied to Gwangju Metropolitan City Environmental Installations Corp(GEIC).
KW - Performance management;Performance indicator;Balanced Scorecard
DO -
UR -
ER -
Jong-hei Ra, Kwangdon Choi and Sang-Joon Lee. (2006). A Study on establishment of performance indicator using BSC for local public enterprise. Journal of The Korea Society of Computer and Information, 11(6), 237-248.
Jong-hei Ra, Kwangdon Choi and Sang-Joon Lee. 2006, "A Study on establishment of performance indicator using BSC for local public enterprise", Journal of The Korea Society of Computer and Information, vol.11, no.6 pp.237-248.
Jong-hei Ra, Kwangdon Choi, Sang-Joon Lee "A Study on establishment of performance indicator using BSC for local public enterprise" Journal of The Korea Society of Computer and Information 11.6 pp.237-248 (2006) : 237.
Jong-hei Ra, Kwangdon Choi, Sang-Joon Lee. A Study on establishment of performance indicator using BSC for local public enterprise. 2006; 11(6), 237-248.
Jong-hei Ra, Kwangdon Choi and Sang-Joon Lee. "A Study on establishment of performance indicator using BSC for local public enterprise" Journal of The Korea Society of Computer and Information 11, no.6 (2006) : 237-248.
Jong-hei Ra; Kwangdon Choi; Sang-Joon Lee. A Study on establishment of performance indicator using BSC for local public enterprise. Journal of The Korea Society of Computer and Information, 11(6), 237-248.
Jong-hei Ra; Kwangdon Choi; Sang-Joon Lee. A Study on establishment of performance indicator using BSC for local public enterprise. Journal of The Korea Society of Computer and Information. 2006; 11(6) 237-248.
Jong-hei Ra, Kwangdon Choi, Sang-Joon Lee. A Study on establishment of performance indicator using BSC for local public enterprise. 2006; 11(6), 237-248.
Jong-hei Ra, Kwangdon Choi and Sang-Joon Lee. "A Study on establishment of performance indicator using BSC for local public enterprise" Journal of The Korea Society of Computer and Information 11, no.6 (2006) : 237-248.