A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Journal of The Korea Society of Computer and Information
  • Abbr : JKSCI
  • 2020, 25(12), pp.1-15
  • DOI : 10.9708/jksci.2020.25.12.001
  • Publisher : The Korean Society Of Computer And Information
  • Research Area : Engineering > Computer Science
  • Received : November 4, 2020
  • Accepted : November 27, 2020
  • Published : December 31, 2020

Jae Hong Lee 1 Tae-Young Kim 1

1(주)글로텍

Accredited

ABSTRACT

In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.