본문 바로가기
  • Home

Layered Analysis of Korean National Standards for Plug-and-Play Interoperability in Smart Greenhouses

  • Journal of The Korea Society of Computer and Information
  • Abbr : JKSCI
  • 2026, 31(11), pp.257~272
  • Publisher : The Korean Society Of Computer And Information
  • Research Area : Engineering > Computer Science
  • Received : July 13, 2026
  • Accepted : November 5, 2026
  • Published : November 30, 2026

Byeongbeom Kang 1,  Hyeok Ki 2,  Cheolwoo Han 3,  Donghyeon Kang 4

1(재)전북테크노파크
2한국농업기술진흥원
3한국폴리텍대학 전북캠퍼스
4한국농수산대학교

Accredited

ABSTRACT

The rapid expansion of smart agriculture has led to the widespread deployment of Information and Communication Technology sensors and actuators in greenhouses, but the lack of interoperability across manufacturers hinders system scalability and maintenance. This paper is a standards analysis and conceptual architecture study without experimental evaluation. Ten Korean national and industrial standards related to plug-and-play (P&P) in smart greenhouses are analyzed; five P&P conditions — attachment without modification, configuration-free commissioning, automatic device identification, automatic register-map derivation, and semantic continuity of data — are derived from their requirements; the standards are then reconstructed into physical/hardware, communication, metadata, and application layers, and the standards applicable to each interface among devices, nodes, the integrated controller, and the platform are classified. The analysis shows that the normative references between layers are specified in the standards themselves and that the device auto-registration procedure requires a specification repository. However, because no nationally accredited repository has been made available to date and current certification and deployment requirements cover only the physical and communication standards, integrated controllers rely on the default register map, and P&P is realized only up to the communication layer. On this basis, two field scenarios are compared against the five conditions, and improvement tasks are presented in order of priority, with establishment of the repository as the first task.

Journal Copyright Policy

No CCL information provided

Citation status

* References for papers published after 2025 are currently being built.