@article{ART001563339},
author={Ho Un Gim},
title={Why Do We Need to Estimate “the Final Output” through the Output-Output Model in the Circulation of Production?},
journal={The Korea Spatial Planning Review},
issn={1229-8638},
year={2011},
volume={69},
pages={179-200},
doi={10.15793/kspr.2011.69..010}
TY - JOUR
AU - Ho Un Gim
TI - Why Do We Need to Estimate “the Final Output” through the Output-Output Model in the Circulation of Production?
JO - The Korea Spatial Planning Review
PY - 2011
VL - 69
IS - null
PB - 국토연구원
SP - 179
EP - 200
SN - 1229-8638
AB - In 2009, a new “Output-Output(OO) model” and table were originally developed by the author to solve the consecutive connection and overestimation problems naturally together through the circulation system of production derived from the interdependent relationship between final demand, total output, and final output.
On the basis of the latest research findings in the literature of Output-Output model, the specific objectives of this paper are summarized as follows. (1) We verify the characteristics and economic interpretations of a new circulation system of production between input-output(IO), output-output(OO), and final demand-final output(FF) models. (2) We establish the various frames of economic analysis, based on the concepts of intermediate and final outputs, through the newly developed Output-Output model. (3) We perform an empirical analysis using the computed values of total and final outputs through the 2007 Output-Output Table of Korea constructed by the author.
KW - Circulation System of Production;Final Output;Intermediate Output;Requirements Matrix;Output-Output Model
DO - 10.15793/kspr.2011.69..010
ER -
Ho Un Gim. (2011). Why Do We Need to Estimate “the Final Output” through the Output-Output Model in the Circulation of Production?. The Korea Spatial Planning Review, 69, 179-200.
Ho Un Gim. 2011, "Why Do We Need to Estimate “the Final Output” through the Output-Output Model in the Circulation of Production?", The Korea Spatial Planning Review, vol.69, pp.179-200. Available from: doi:10.15793/kspr.2011.69..010
Ho Un Gim "Why Do We Need to Estimate “the Final Output” through the Output-Output Model in the Circulation of Production?" The Korea Spatial Planning Review 69 pp.179-200 (2011) : 179.
Ho Un Gim. Why Do We Need to Estimate “the Final Output” through the Output-Output Model in the Circulation of Production?. 2011; 69 179-200. Available from: doi:10.15793/kspr.2011.69..010
Ho Un Gim. "Why Do We Need to Estimate “the Final Output” through the Output-Output Model in the Circulation of Production?" The Korea Spatial Planning Review 69(2011) : 179-200.doi: 10.15793/kspr.2011.69..010
Ho Un Gim. Why Do We Need to Estimate “the Final Output” through the Output-Output Model in the Circulation of Production?. The Korea Spatial Planning Review, 69, 179-200. doi: 10.15793/kspr.2011.69..010
Ho Un Gim. Why Do We Need to Estimate “the Final Output” through the Output-Output Model in the Circulation of Production?. The Korea Spatial Planning Review. 2011; 69 179-200. doi: 10.15793/kspr.2011.69..010
Ho Un Gim. Why Do We Need to Estimate “the Final Output” through the Output-Output Model in the Circulation of Production?. 2011; 69 179-200. Available from: doi:10.15793/kspr.2011.69..010
Ho Un Gim. "Why Do We Need to Estimate “the Final Output” through the Output-Output Model in the Circulation of Production?" The Korea Spatial Planning Review 69(2011) : 179-200.doi: 10.15793/kspr.2011.69..010