본문 바로가기
  • Home

Preparation of pitch-based activated carbon with surface-treated fly ash for SO2 gas removal

  • Carbon Letters
  • Abbr : Carbon Lett.
  • 2020, 30(4), pp.381-387
  • DOI : 10.1007/s42823-019-00107-y
  • Publisher : Korean Carbon Society
  • Research Area : Natural Science > Natural Science General > Other Natural Sciences General
  • Received : August 2, 2019
  • Accepted : November 6, 2019
  • Published : August 1, 2020

Kim Min Il 1 Im Ji Sun 1 Seo Sang Wan 1 Cho Jong Hoon 1 Lee, Young-Seak 2 Kim Sangjin 3

1한국화학연구원
2충남대학교
3구미정보전자기술원

Accredited

ABSTRACT

Fly ash consists of various metal oxides which can remove SO2 gas by the catalyst efect. When fy ash is added in the prepa�ration process of pitch-based activated carbon, the pitch particles aggregate and fy ash is embedded in the activated carbon. To increase SO2 gas removal performance, activated carbon was prepared by surface-treated fy ash and petroleum-based pitch. Carboxyl groups were introduced into the fy ash by malic acid treatment. The introduced carboxyl groups acted as an activation agent to create micropore around the fy ash, and created micropores were exposed to the fy ash outside of the activated carbon. The exposed fy ash increased removal amount of SO2 gas by a catalytic efect of the metal oxides. The SO2 gas removal performance improved by 34% because of the catalyst efect of the exposed fy ash and improvement in the micropore structure in the activated carbon.

Citation status

This is the result of checking the information with the same ISSN, publication year, volume, and start page between the WoS and the KCI journals. (as of 2024-07-28)

Total Citation Counts(KCI+WOS) (12) This is the number of times that the duplicate count has been removed by comparing the citation list of WoS and KCI.

Scopus Citation Counts (13) This is the result of checking the information with the same ISSN, publication year, volume, and start page between articles in KCI and the SCOPUS journals. (as of 2024-10-01)

* References for papers published after 2023 are currently being built.