@article{ART001553989},
author={TAEKWAN KIM},
title={A study on contracting parties' responsible reasons for the variation in the general conditions of construction contract},
journal={DONG-A LAW REVIEW},
issn={1225-3405},
year={2011},
number={51},
pages={203-239}
TY - JOUR
AU - TAEKWAN KIM
TI - A study on contracting parties' responsible reasons for the variation in the general conditions of construction contract
JO - DONG-A LAW REVIEW
PY - 2011
VL - null
IS - 51
PB - The Institute for Legal Studies Dong-A University
SP - 203
EP - 239
SN - 1225-3405
AB - General Conditions of construction contract provided that the provisions relating to variation, but The meaning of the variation and variation, according to the liability in respect of a proper study is not well known. General Conditions of construction contract established by the variation, according to the contract price adjustment system, to fully understand the General Conditions of construction contract on both the design-build and not. it is based the parties responsible for variation for the reasons it is necessary to review. In other words, in interpreting the reasons for variation, variation and final destination of a range of high-level design, design-build and separated design-build construction contracts according to the bulk of design work for a person who is responsible for the primary reason responsible for variation, material There is a need for acceptance. Particularly design-build Construction Contract for variation in the amount of increase in the contract to acknowledge the reason for the contract partner's responsibility in interpreting a written contract opponent bids high-level design to reflect the requirements of Notes validly be made, contract reflects the fact which demands from the plan bookshelf bidding guidebook which draws up and lawfully, being drawn up, the cause of variation occurred from the contract relative voluntary dominative territory outside to finish the thing and a contract facing each other own normal attention, the fact that will obstruct a variation impossibility all must give proof the thing and the variation is not a contract relative voluntary responsibility.
KW - general conditions of construction contract;variation;responsible reason of party;force majeure;turn-key based construction contract;design
DO -
UR -
ER -
TAEKWAN KIM. (2011). A study on contracting parties' responsible reasons for the variation in the general conditions of construction contract. DONG-A LAW REVIEW, 51, 203-239.
TAEKWAN KIM. 2011, "A study on contracting parties' responsible reasons for the variation in the general conditions of construction contract", DONG-A LAW REVIEW, no.51, pp.203-239.
TAEKWAN KIM "A study on contracting parties' responsible reasons for the variation in the general conditions of construction contract" DONG-A LAW REVIEW 51 pp.203-239 (2011) : 203.
TAEKWAN KIM. A study on contracting parties' responsible reasons for the variation in the general conditions of construction contract. 2011; 51 : 203-239.
TAEKWAN KIM. "A study on contracting parties' responsible reasons for the variation in the general conditions of construction contract" DONG-A LAW REVIEW no.51(2011) : 203-239.
TAEKWAN KIM. A study on contracting parties' responsible reasons for the variation in the general conditions of construction contract. DONG-A LAW REVIEW, 51, 203-239.
TAEKWAN KIM. A study on contracting parties' responsible reasons for the variation in the general conditions of construction contract. DONG-A LAW REVIEW. 2011; 51 203-239.
TAEKWAN KIM. A study on contracting parties' responsible reasons for the variation in the general conditions of construction contract. 2011; 51 : 203-239.
TAEKWAN KIM. "A study on contracting parties' responsible reasons for the variation in the general conditions of construction contract" DONG-A LAW REVIEW no.51(2011) : 203-239.