본문 바로가기
  • Home

The Formation of Railway Transport Hubs in the Gando Region through the Selection of Railway Routes and Station Locations on the Duntu Line

  • Journal of Manchurian Studies
  • Abbr : 만주연구
  • 2026, (42), pp.83~120
  • DOI : 10.22888/mcsa..42.202610.83
  • Publisher : The Manchurian Studies Association
  • Research Area : Social Science > Area Studies > East Asia > China
  • Received : September 10, 2026
  • Accepted : October 12, 2026
  • Published : October 31, 2026

LHO KYUNGMIN 1

1한국전통문화대학교

Accredited

ABSTRACT

This study examines how the route and station sites of the Duntu Line were determined and how that decision reshaped the railway network of the Gando region. Four route survey records are read alongside the Records of the Construction of the Duntu and Tiantu Lines in chronological order, and the routes and station sites under consideration at each stage are compared with the distribution of major settlements and the alignment of the Tiantu Light Railway. Before the Duntu Line, Longjing was a hub in the regional network connecting Laotougou, Yanji, and towns along the Tumen River. Survey teams considered several routes through Longjing, but a shorter alignment without long tunnels ruled them out. The third survey, done in 1926 and 1927, chose a route that bypassed the town. By the final survey in 1932, all three teams had revised their sections, swapping long tunnels for loop lines, bypasses, and bridges. Station sites were determined primarily by topography and operating conditions rather than by the size of existing settlements, and each station's scale and facilities followed from its expected role in the network and its projected traffic. When the line opened, Dunhua changed from the terminus of the Jidun Line into a through station, and Huimodong, a small settlement at the time of the surveys, became the principal border terminal. The Tiantu Light Railway was rebuilt as a branch from Chaoyangchuan, and Longjing became a station on the branch line. The Duntu Line drew in part on the existing transport network and settlement pattern, but it created a new main railway axis and redistributed the roles of Gando's principal stations.

Journal Copyright Policy

No CCL information provided

Citation status

* References for papers published after 2025 are currently being built.

This paper was written with support from the National Research Foundation of Korea.