@article{ART001884592},
author={Sungkyu Park and Sung Won Lee},
title={A Study on Determinants of Golf-Course Construction Period},
journal={Korea Real Estate Review},
issn={2092-5395},
year={2014},
volume={24},
number={2},
pages={97-111}
TY - JOUR
AU - Sungkyu Park
AU - Sung Won Lee
TI - A Study on Determinants of Golf-Course Construction Period
JO - Korea Real Estate Review
PY - 2014
VL - 24
IS - 2
PB - korea real estate research institute
SP - 97
EP - 111
SN - 2092-5395
AB - The purpose of this paper is to provide the direction of the efficient construction through the empirical analysis concerning socioeconomic factors, influencing on the Golf-Course construction period. First, examining the brief outline of the Golf-Course construction related-laws, this paper looks at the things that construction regulation has been dramatically released in the mid 2000s due to the market factors (i.e., increase of golf population) and the policy factors (i.e., growth of the regional economy). In the trend of deregulation, the paper sets hypothesis that developers with low expertise and small business groups caused the major problems in business such as ‘not yet start’ and ‘delay of project’ that is occurred after the financial crisis in 2009. In order to verify it, we set the several experimental variables on the Golf-Course construction period (i.e., provisional seizure or attachment and use of eminent domain). These variables were statistically significant. This result implies that an effort to ensure the efficient Golf-Course construction is needed.
KW - golf-course;construction period;eminent domain;public use;efficiency
DO -
UR -
ER -
Sungkyu Park and Sung Won Lee. (2014). A Study on Determinants of Golf-Course Construction Period. Korea Real Estate Review, 24(2), 97-111.
Sungkyu Park and Sung Won Lee. 2014, "A Study on Determinants of Golf-Course Construction Period", Korea Real Estate Review, vol.24, no.2 pp.97-111.
Sungkyu Park, Sung Won Lee "A Study on Determinants of Golf-Course Construction Period" Korea Real Estate Review 24.2 pp.97-111 (2014) : 97.
Sungkyu Park, Sung Won Lee. A Study on Determinants of Golf-Course Construction Period. 2014; 24(2), 97-111.
Sungkyu Park and Sung Won Lee. "A Study on Determinants of Golf-Course Construction Period" Korea Real Estate Review 24, no.2 (2014) : 97-111.
Sungkyu Park; Sung Won Lee. A Study on Determinants of Golf-Course Construction Period. Korea Real Estate Review, 24(2), 97-111.
Sungkyu Park; Sung Won Lee. A Study on Determinants of Golf-Course Construction Period. Korea Real Estate Review. 2014; 24(2) 97-111.
Sungkyu Park, Sung Won Lee. A Study on Determinants of Golf-Course Construction Period. 2014; 24(2), 97-111.
Sungkyu Park and Sung Won Lee. "A Study on Determinants of Golf-Course Construction Period" Korea Real Estate Review 24, no.2 (2014) : 97-111.